Route    

History and Theme

Operations

Track Plan

scn.jpg (6617 bytes)

WP Jct.    Mac St.  West San Jose   E Rica  Dougherty's  Damsite Jct. Cement Plant  Fallon 

Physically the Santa Cruz Northern occupies most of a two car garage (with room for a car)

In this picture, Fallon and WP Junction are to our immediate right. Mac Street yard is around the corner and down the aisle. Santa Cruz Portland Cement is directly ahead on the second level. On the far left is the helix and Watson Crick Trestle. Down the aisle between the helix and the cement plant are Dougherty's on the upper level and E Rica on the lower. Out of sight to the left is Zayante Station and the three track visible upper level staging yard representing Santa Cruz.

 

PC190042.JPG (38105 bytes)